UK company “seriously considering” GPS tracking devices in school uniforms

Saturday, August 25, 2007

The leading supplier of school uniforms in the United Kingdom, Lancashire-based manufacturer Trutex, has announced it is “seriously considering” including GPS tracking devices in future ranges of its uniform products after conducting an online survey of both parents and children.

“As a direct result of the survey, we are now seriously considering incorporating a [tracking] device into future ranges” said Trutex marketing director Clare Rix.

The survey questioned 809 parents and 444 children aged nine to 16. It showed that 44% of parents were worried about the safety of pre-teen children, and 59% wanted tracking devices installed in school apparel. 39% of children aged nine to 12 were prepared to wear clothing with tracking devices in them, while teenagers were notably less enthusiastic and more wary of what Trutex has admitted they see as a “big brother” concept.

However, Trutex has claimed the tracking devices would bring about worthwhile benefits, including being a valuable resource for parents who wanted to keep a close eye on where their children were at all times.

“As well as being a safety net for parents, there could be real benefits for schools who could keep a closer track on the whereabouts of their pupils, potentially reducing truancy levels” says Rix.

Each year, Trutex supplies 1 million blouses, 1.1 million shirts, 250,000 pairs of trousers, 20,000 blazers, 60,000 skirts and 110,000 pieces of knitwear to the UK.

It is not the first company to manufacture school uniforms with a central focus on child safety; last week Essex firm BladeRunner revealed it was selling stab-proof school blazers to parents concerned about violence against their children. The blazers were outfitted with Kevlar, a synthetic fibre used in body armour. It has already received orders internationally, including Australia.

If the Trutex tracking devices go ahead, it is unclear where in the uniform they will be located.

Retrieved from “https://en.wikinews.org/w/index.php?title=UK_company_%22seriously_considering%22_GPS_tracking_devices_in_school_uniforms&oldid=482309”

US suspects North Korea and Burma participating in ‘covert military’ activities

Sunday, December 12, 2010

In diplomatic cables released by the whistle blowing website Wikileaks on Friday, it is revealed that the United States embassy in Rangoon suspects the North Korean and Burmese military are participating in “covert military or military-industrial” activities. In the cables dating back as early as January 2004, the embassy reports the military activities could include the construction of a nuclear reactor in or near Minbu, along with “SAM missiles” and an underground facility with as many as 300 North Korean military personnel assisting the Burmese military in the construction. Burma is primarily controlled by its military.

In the January 2004 cable, a businessman reportedly told the U.S. embassy in Rangoon that “massive” barges were bringing in large pieces of equipment to Minbu from the Irawaddy River. He suggested that “the quantities involved as well as the diameter of the rebar suggested a project larger than ‘factories.'” In the same cable, the U.S. acknowledges that rumors of a nuclear reactor being constructed in the area date back to 2002, with suspected Russian involvement. “Rumors of ongoing construction of a nuclear reactor are surprisingly consistent and observations of activity such as that described [sic] appear to be increasing,” said Martinez, the reported cable author. According to a news report in March, The Irrawaddy claims Burma was close to completing at least three nuclear reactors. The country’s leadership claims the nuclear research that is taking place is to be used for peaceful purposes.

In August of the same year, the U.S embassy receives more information that North Korea military is assisting in the construction of “SAM missiles (surface to air missiles) of unknown origin” and an “underground, concrete reinforced” facility in Minbu. The construction allegedly includes buildings which would house at least “20 Burmese army battalions that will be posted near the site.” The correspondent again says that the report “tracks with other information Embassy Rangoon and others have reported in various channels.”

“This account is perhaps best considered alongside other information of various origins indicating the Burmese and North Koreans are up to something. Something of a covert military or military-industrial nature. Exactly what, and on what scale, remains to be determined,” said McMullen, the reported cable author. He also admits that the number of North Koreans thought to be assisting the Burmese military “is much higher than our best estimates of North Koreans in Burma.” According to the Agence France-Presse in 2002, citing an unnamed U.S State Department official, the U.S. warned Burma not to pursue a nuclear program saying that it expects Burma “to live up to its obligations [under the non-proliferation treaty] and to not pursue production of weapons grade fissile material.” However a 2008 cable says that Burma may already be in possession of weapons grade uranium. The cable reports that a civilian tried to sell 2,000 kilograms of uranium-238 which “could be dug up” from the ground at a site in Kayah State. Uranium-238 could be used in the construction of nuclear weapons.

“A Burmese civilian met with members of USDAO [United States Defense Attaché Office] Rangoon and offered to sell Uranium-238. The individual had initially contacted the USDAO eight days prior with the offer. The individual provided a small bottle half-filled with metallic powder and a photocopied certificate of testing from a Chinese university dated 1992 as verification of the radioactive nature of the powder,” said the cable. “The individual claimed to be able to provide up to 2000 kg of uranium-bearing rock from a location in Kayah State, and further stated if the U.S. was not interested in purchasing the uranium, he and his associates would try to sell it to other countries, beginning with Thailand,” it added. The cable adds that the Burmese government was unaware that such a transaction was taking place and that they “would likely seize any additional samples or stocks of the material if aware of their existence.” However, a cable in January of 2007 says that the Burmese military may have received a shipment of uranium at the end of that month. The “sensitive shipment” was said to have come from Singapore via shipping freighter.

“[An unnamed witness] claimed that metals are usually exported in blocks, whereas the bags in this shipment were filled with loose earth and mud. The source of the mixed ore, Maw Chi, is also a source for uranium, they claimed. Security was tighter than usual, surveillance was heavier, and officials paid closer attention to the movement of the shipment and activity at the port,” said the cable. The cable author, ‘Villarosa,’ later states that the embassy in Rangoon was given allegedly detailed information on the shipping methods, weight and cost. No further cables have yet to be released on the matter.

Retrieved from “https://en.wikinews.org/w/index.php?title=US_suspects_North_Korea_and_Burma_participating_in_%27covert_military%27_activities&oldid=3195238”

Houston Car Wreck Attorney Why These Six Rules Make Writing Compelling Ads For Sale Snap

Houston Car Wreck Attorney – Why These Six Rules Make Writing Compelling Ads For Sale Snap

by

COREYSANDOVAL

Houston car wreck attorney people like to eat a bit of written replies ads. If you put all the right ingredients together. You\’re sure to get the sale. So let\’s look at a recipe for a writing ads that inspire people to buy. Rule number 1. Be an important part in the drafting of effective ads specificthe to be very specific. You will need to think about problems that you know. Houston car wreck attorney motivate your ideal client to take action. And then grab their attention by offering solutions to the exact problem that keeps them awake at night. (if you have identified your ideal client. It first before proceeding) on the road # 2. Solve a real provlemadvertisingk is an invitation to \”try\” a product that solves a very real problem.

[youtube]http://www.youtube.com/watch?v=xhH2r3mKFeI[/youtube]

In particular you are about to give a complete solution. The more your customers will be convinced. Houston car wreck attorney you\’ll be surprised how easy it is to make sales when you take the time to listen to your customers and find out what bugs them! so learn as much as you can about their values. Beliefs, and what is important to them about the most. It gives you the ammunition you need to write more focused. Specific ads. For example, a new fitness center can write an ad like this: put a dress size in time for your wedding in 30 days or less. Come meet our knowledgeable coaches and get a 7-day pass to our newest facility. Can sell more travel agencies travel to the caribbean with a declaration like this: get a home for the holidays with our pre-season discount tickets for students. Houston car wreck attorney make a purchase now while supplies last. Limited number of flights to the caribbean for half the price. (best price guaranteed if purchased by october. 15. ) a luxury car dealer could attract new customers this way: drive to impress. Visit our showroom and test drive this year\’s latest models! enjoy the luxury and power of our most recent shipment of a bmw sedan and rent the first month free. These examples highlight the other components of effective advertising writing: rule # 3. Houston car wreck attorney focus on the needs of customers. Not on your experience or qualifications. Remember, people buy based on their needs. Not what we sell. So do the best we urgently need to provide your customers right now. For every ad you write. Imagine the face, the problem you\’re trying to solve: in the first example of that is the future bride. Houston car wreck attorney who must lose 10 pounds to fit into her wedding dress. The second student (the student\’s budget). Who is dying back home for christmas in the caribbean. The third is a businessman who wants to demonstrate its success by the car he drives. Use this example as a drawing to help you. Rule # 4. We offer solutions are necessary. Houston car wreck attorney then why buy them. The aim of advertising is to make a solution that desperately want \”easy\” to get the product or service that you have for sale. \”how to lose 10 lbs. Quickly, how to get home for christmas cheap or how to afford the latest european sports car. \”easily solved if they buy a product for sale. This is a no brainer! rule # 5. Create urgency by stating a time cut off. Limited offer, or special bonus. When you set a time or a price squeeze. To create a sense of urgency. houston car wreck attorney

it increases the motivating forces. You can invite them to act quickly or rate their chance. It helps people make the choice to act now. Otherwise they can not act at all. Rule # 6. Products take more value when they solve your customers\’ problems. If you are interested in their pay to resolve the problem with your invitation to become amazed at the number of targeted users! connect and deliver the perfect solution for you. You have to keep returning to see their friends who are and who the users are creating a fan base.

Need more help with writing great ads? you can visit my website and the steps you need to target your ideal customer, lead, and a bonus gift for writing great ads have my free \”sales action guide\” can sign up for.

houston car wreck attorney

so focus on the sustomers vhose problems you solvay best, and keep the things they desire most ophphering that fear. Responding to the needs of its best customers will create a loyal following and your business will continu

Article Source:

ArticleRich.com

London Tube bombs went ‘bang bang bang, very close together’

Saturday, July 9, 2005

After a press conference in London from the Metropolitan Police and Transport for London, more details are emerging about the attacks in London on Thursday.

Data from the Underground system’s power and control systems have revealed that all three bombs went off within 50 seconds of each other, at 8.50am, with the managing director of Transport for London, Tim O’Toole saying the bombs went “bang bang bang, very close together”.

The first bomb to detonate was on the Liverpool Street train soon after it left for Aldgate on the Circle line, seconds before the others. The blast tripped out the power system, visible in the control room. The first call the police received that morning reported “a bang” at Aldgate East, coming within a minute of the blast.

The Edgware Road train, leaving for Paddington and also on the Circle, exploded opposite a train coming from the other direction, making people think at first that it was a derailment. The first call to the Police spoke not of an explosion, but of a person falling under the wheels of the train. The confirmation of a bomb did not come until 9.17am, but by that time the emergency services were already on scene.

Transport for London’s new TrackerNet software is fully opertational on the Circle line, which allows for precise tracking of trains, but is not yet fully installed on the Piccadilly line. The first indication of the Piccadilly line bomb was when the tunnel telephone system wires were cut by the blast, an event logged by other software. The cutting of the lines then tripped out the track current. The tunnel itself suffered only slight damage and is safe, but the train – which was packed with commuters heading for Russell Square – is very badly damaged.

London Underground declared a ‘code Amber’ within minutes, moving trains to platforms and opening all doors. A ‘code Red’ – full evacuation – was set at around 9.15am. O’Toole described the decision to evacuate as being “very grave, not taken lightly”. When questioned as to whether everything possible had been done on the day to save lives, the managing director of Transport for London was “very proud” of the choices made that morning.

As investigations continue, all bodies have been removed from the sub-surface Circle line trains, but the carriages themselves are still in situ while a painstaking forensic investigation takes place.

Currently, work is on-going to retrieve bodies and forensic evidence from the carriage of the train in the deep tunnel of the Piccadilly line near King’s Cross. Teams of rescue workers looking for human remains are working alongside forensics experts in a “meticulous” search to find evidence.

Conditions are described as being very difficult, with high temperatures and lots of dust. Work was halted over Friday night when conditions became too bad, and resumed this morning. Efforts have been made to improve the ventilation.

Work will continue throughout tonight and possibly into Sunday. The exact number of bodies still in the wrecked carriage is unknown.

Access from King’s Cross is impossible, so workers are taking the longer route from Russell Square station to get to the front of the train.

Police have revealed that the bombs were ‘high explosives’ – not homemade. However they are declining to be specific about their composition as the information could be useful when they interrogate suspects.

Police will not confirm or deny if any parts of a timer have been found, but have said that “any device will now be in a million pieces”. Police believe the use of timers more likely than suicide bombings as the blasts were so closely timed, but are not ruling out anything.

Retrieved from “https://en.wikinews.org/w/index.php?title=London_Tube_bombs_went_%27bang_bang_bang,_very_close_together%27&oldid=2461598”

Buffalo, N.Y. hotel proposal delayed further

Buffalo, N.Y. Hotel Proposal Controversy
Recent Developments
  • “Old deeds threaten Buffalo, NY hotel development” — Wikinews, November 21, 2006
  • “Proposal for Buffalo, N.Y. hotel reportedly dead: parcels for sale “by owner”” — Wikinews, November 16, 2006
  • “Contract to buy properties on site of Buffalo, N.Y. hotel proposal extended” — Wikinews, October 2, 2006
  • “Court date “as needed” for lawsuit against Buffalo, N.Y. hotel proposal” — Wikinews, August 14, 2006
  • “Preliminary hearing for lawsuit against Buffalo, N.Y. hotel proposal rescheduled” — Wikinews, July 26, 2006
  • “Elmwood Village Hotel proposal in Buffalo, N.Y. withdrawn” — Wikinews, July 13, 2006
  • “Preliminary hearing against Buffalo, N.Y. hotel proposal delayed” — Wikinews, June 2, 2006
Original Story
  • “Hotel development proposal could displace Buffalo, NY business owners” — Wikinews, February 17, 2006

Friday, March 10, 2006

Buffalo, New York —The Common Council of Buffalo voted on Tuesday to send the Elmwood Village Hotel proposal “to committee for further discussion”, after citing the need for more public involvement.

The Elmwood Village Hotel is a development proposal by the Savarino Construction Services Corporation, a project designed by the architect Karl Frizlen of The Frizlen Group. The hotel would be placed on the southeast corner of Elmwood and Forest Avenues in Buffalo.

To make way for the project, at least five buildings located at 1109 to 1121 Elmwood Ave would be demolished. At least two properties on Forest Avenue could also be demolished. The Elmwood properties, according to Eva Hassett, Vice President of Savarion Construction, are “under contract”, but it is unclear if Savarino Construction actually owns the Elmwood properties. Hans Mobius, a former mayorial candidate, is still believed to be the current owner the properties. Mobius also owns 607 Forest Avenue.

The properties 605 and 607 Forest Avenue could also be included in the proposal according to Hassett.

“We would use a Special Development Plan to rezone 1119-1121 Elmwood and 605 Forest to a C-2 zoning category,” stated Hassett. It is possible that Savarino Construction may try to obtain a variance for 605 Forest, which would allow them to enforce eminent domain, should the hotel be allowed to go forward.

The building at 607 Forest was also discussed to be rezoned, but it is unclear what the plans would be for that property. During the February 28 Common Council meeting, Hassett stated that the properties 605 and 607 were “now off the agenda”.

Pano Georgiadis, owner of Pano’s Restaurant at 1081 Elmwood, owns the property at 605 Forest and attended Tuesday’s Common Council meeting.

“Having a hotel is a bright idea. We all love the idea of a hotel, but the way that it is presented, is wishful thinking. This hotel does not fit. It’s like putting two gallons of water in a gallon jug, it does not fit. At the last meeting, the architect admitted that they are planning to put the undergound parking lot and the hotel, right at the property line. If I open my window, I will be able to touch the wall, that goes fifty feet high”, said Georgiadis.

“There is a problem having a seventy-two room hotel and fifty-five parking spaces. That means that all the other cars will spill all over the neighborhood. The footprint is simply too small. If you have a bigger [parking] lot, and a smaller hotel, I will welcome a hotel. I have a parking lot at my own business, and I am chasing people all day long. Remember, the city says it has ‘zero tolerance [for illegal parking]’. Try telling that to the guy from Albany who came to see his kids, that are going to Buffalo State, who would get tickets totaling over a hundred dollars”, added Georgiadis.

The city’s Planning Board is scheduled to meet on March 14, 2006 at 9:00 a.m. about the proposal. Although a discussion will take place, no vote is expected to be taken.

At the moment, none of the properties are zoned for a hotel. Savarino Construction plans on asking for a C2 zoning permit. If that does not work, they plan to implement a new zoning plan called a “special development plan” which would allow for only a hotel on the site. That zone would not be able to be changed.

“This [project] justifies Mobius’s refusal to invest in any maitenance[sic] or improvements”, on the properties said Clarence Carnahan, a local resident. “Where were the Council persons over the years? Where were the city inspectors over the years, to make sure that he maintained and improved his properties? The government was supposed to be protecting, not being preditorial. I see a predatorial issue here when it comes to this hotel. Over the years: Why has the local government been disfunctional when it came to Mobius’s properties? Refusal to invest in improvements, doesn’t that sound like a slumlord? Maybe I am missing a point here, but what kind of messages does this send to other slumlords that havn’t[sic] been jailed or fined? It’s [the hotel] trying to be pushed through.”

Carnahan also presented signs for residents and or business owners who are opposed to the hotel, that could be placed in windows or on stakes in the yard. Some of the signs said, ‘No tell hotel’, ‘Hans off, no hotel’, ‘It takes more than a hotel to make a village’. and ‘Keep Elmwood free, no hotel’. Carnahan plans on making more signs for a protest to be held on Saturday March 18, at 2:00 p.m. (EST) on Elmwood and Forest. Some signs were given to individuals after the meeting.

“First things first, Hans is the problem, and I don’t think it has been addressed. Let’s roll back the clock on this project. What can we do with Hans? There is such thing as eminent domain, which could be of greater interest to the community, to seize the property at its lowest assessed value”, said Nancy Pollina, co-owner of Don Apparel with Patty Morris at 1119 Elmwood. “There are so many ideas that have not been explored and we are about to give this parcel away, to a big developer.”

Mobius has not returned any calls by Wikinews regarding the situation.

A freelance journalist writing for Wikinews has obtained a letter, exclusively, addressed to one of the five business owners from Hans Mobius stating:

There is a proposal to develop my property which you are currently renting. Because of opposition to this development, it does not look like it will happen. I will let you know if there any changes.

Despite the letter, there have been no plans or decisions made to end the proposal.

To date, none of the business owners or residents of 1119-1121 Elmwood have received an eviction notice.

Business owners and residents gave an indication of what they would like to see happen at the corner; a project similar to one done locally last year. There, developers renovated two buildings on Auburn and Elmwood Avenues, merging the buildings into one thus allowing for more shop space. Among some of the shops to move in after the development were Cone Five Pottery, The Ruby Slipper, and Abraham’s Jewelers. Prior to the renovation work, the left building in the picture was boarded up for several years. Many of the concerned locals would like to see a similar development on Forest and Elmwood.

Rocco Termini, a developer in Buffalo, proposed a similar design at the February 28 community meeting

In an interview after the February 28 meeting, Termini stated, “I will be willing to take a look at this myself, or I would be more than happy to be partners with Sam, Sam Savarino”, who is President and Chief Executive Officer of Savarino Construction Services Corp.

So far Savarino Construction has no plans to team up with Termini.

Retrieved from “https://en.wikinews.org/w/index.php?title=Buffalo,_N.Y._hotel_proposal_delayed_further&oldid=2584585”

Pet Food Processing Market Growth Factors, Ongoing Trends And Key Players 2026

The pet food processing market size is projected to grow from USD 4.4 billion in 2019 to USD 6.2 billion by 2026, recording a compound annual growth rate (CAGR) of 5.0% during the forecast period. The increasing trend of pet food product premiumization and the rising acceptance of pets across regions are factors that are projected to drive the growth of the pet food processing market. Furthermore, acceptance of pets as family members among pet owners, increasing disposable income, and rising urbanization are factors that are also projected to drive the market growth.

Key Players in the Market:

  • Andritz Group (Austria)
  • Buhler Holding AG (Switzerland)
  • The Middleby Corporation (US)
  • GEA Group (Germany)
  • Baker Perkins Ltd. (UK)
  • Clextral SAS (France)
  • Precision Food Innovations (US)

Download PDF brochure:

The dog food segment is estimated to account for the largest share in the market.

The dog food segment is estimated to dominate the pet food processing market, on the basis of application, in terms of value, in 2019. Dog food is witnessing increased demand due to the increasing dog population across regions. The increasing trend of pet humanization has also encouraged dog owners to accept them as companions due to their friendliness, which is projected to drive the demand for premium dog food products, thus contributing to the growth of the overall market.

The dry segment is projected to account for the largest share during the forecast period.

Dry pet food production is increasing, and its sales are projected to remain high in developing countries, such as China, Russia, and Poland. The demand for dry pet food products is increasing due to the cost-effectiveness of dry form, convenience in handling, and ease of purchasing in bulk. In addition, with the increase use of extrusion technologies, dry pet food production remains high. These factors are projected to drive the demand for pet food processing solutions.

The forming equipment segment in the market is projected to dominate the market.

The forming equipment segment is estimated to dominate the market in 2019. Pet food processors are shifting their focus toward extrusion-based manufacturing. The introduction of new extrusion technologies and its use in the pet food sector are factors that are projected to drive the demand for forming equipment in the market.

Speak to Analyst:

The Asia Pacific region is projected to be the fastest-growing market for pet food processing during the forecast period.

The Asia Pacific region is projected to be the fastest-growing market for pet food processing during the forecast period. The region witnesses a high demand for pet food products due to the increasing acceptance of pets. The rising concerns among pet owners regarding the health of pets have led to an increase in demand for high-quality pet food products that require specialized machinery. These factors are projected to create growth opportunities for equipment manufacturers in countries such as India, China, Japan, and Thailand.

Denunciations of Scandals Threaten UN

Tuesday, April 19, 2005

Denunciations of corruption, bribe, collection of bribes from refugees [1] and of sexual scandal involving the peacekeepers [2], [3] threaten the Organization of the United Nations (UN).

The gravest denunciations involve the aid project to Iraq, called Oil-for-Food. Grave denunciations of bribe exist, superfluous accounting and collaboration with the ex-dictator Saddam Hussein, against staff of the UN, companies and politicians of several countries. Even the secretary of the UN, Kofi Annan was suspicious of participation in the plan of corruption. And also grave doubts still hover about his son, Kojo Annan.

The gravity of the denunciations threatens not only the credibility of the UN, but its existence.

Secretary Kofi Annan said that he is going to promote reforms in the organization. [4]

Retrieved from “https://en.wikinews.org/w/index.php?title=Denunciations_of_Scandals_Threaten_UN&oldid=4540035”

Surprise demolition of partially collapsed building in Buffalo, New York met with opposition

Saturday, June 14, 2008

Buffalo, New York —Wikinews has learned that, in a surprising turn of events, the city of Buffalo located in New York, has ordered and begun an emergency demolition on a three story 19th century stable which partially collapsed on Wednesday June 11 causing at least five homes to be evacuated. Residents are not happy, and despite the short notice of the demolition, nearly 30 people showed up to protest it. Demolition was not supposed to begin until Monday June 16.

At about 2:30 p.m. (eastern time) on June 13, demolition crew arrived at the stable located at 428 Jersey Avenue and began to unload heavy equipment which will be used to demolish the building. This came as a surprise to residents, as demolition was not supposed to start until Monday June 16.

During the early afternoon hours on June 11, the Buffalo Fire Department was called to scene after residents called 9-1-1 stating that part of the building had collapsed. Material from the building fell into the yards of at least three neighboring houses. Some of the bricks landed inside the building, while some fell into the yards of some houses behind homes on Richmond Avenue, leaving a ‘V’ shape.

At about 3:30 p.m. crews began to demolish a small portion of the stable located behind Joe Murray’s home, a resident who lives behind a portion of the building on Jersey and Richmond avenues. While demolition was taking place, the section collapsed into Murray’s backyard, prompting a call to police. Some residents who own home surrounding the building were inside Murray’s house holding a neighborhood meeting when demolition began. No one was injured when the section collapsed.

“[The building] can come down any minute,” stated Donna Berry of the Buffalo Police Department who also added that when police arrived on scene, they immediately put a stop to demolition, fearing the safety of surrounding residents and pedestrians.

“So many [of the] people [living around the building] are at risk, it makes me want to cry,” added Berry.

Police, local politicians and area residents are concerned that demolition crews and the city are not taking the proper precautions to ensure the safety of residents during demolition.

“[There is] no protection for neighbors. [This is] appalling and beyond negligence,” stated Tim Tielman, Executive Director of the Campaign for Buffalo who was referring to the negligence of the demolition crew.

“[In order to stop demolition] citizens must demonstrate direct harm to themselves,” added Tielman.

The city’s preservation board held an emergency meeting on Thursday to discuss the issue. Wikinews has learned that the owner of the building, Bob Freudenheim, gave the city permission to demolish the building because he would not be “rehabilitating the building anytime soon.” Freudenheim was part-owner of the Hotel Lenox at 140 North Street in Buffalo and was also an advocate to stop the Elmwood Village Hotel from being built on the corners of Forest and Elmwood Avenues in 2006 and 2007, which Wikinews extensively covered. He also financially supported a lawsuit in an attempt to stop the hotel from being built. Though it is not known exactly how long Freudenheim has owned the stable, Wikinews has learned that he was the owner while fighting to stop the hotel from being built.

Tielman states that he was in contact with Freudenheim this morning. Tielman states that Freudenheim “is not spending a dime” to have the building renovated. Tielman states that Freudenheim has offered to sell the building to any interested party for only one US dollar, but that he “flip flops [his decision] constantly,” sometimes wanting hundreds of thousands of dollars for the building. Wikinews has attempted to contact Freudenheim, but so far has been unsuccessful.

City building inspectors were also on scene evaluating the building and ensuring the safety of residents. Donald Grezebielucina states that “some people are on notice to vacate their properties”, but also stated that no other precautions were being taken other than placing “tires and scaffolding” onto the side of 430 Jersey, which sits less than eight feet from the buildings East side.

“The gas has been shut off in case we lost the building, so there would be no explosions or anything like that. It’s so unstable, the structural integrity is gone. The chemical composite of the trusses has changed dramatically and dry rotted. There are three vehicles in the basement which totally disappeared,” stated Grezebielucina to the press while protesters yelled “save our building, save our neighborhood.”

Wikinews has also learned that local residents have consulted a lawyer regarding the issue, and hope to petition the New York State Supreme court to issue an injunction to stop demolition. They states that Freudenheim should be “100% responsible” for his actions, and many are afraid that once the building is demolished, Freudenheim’s charges of neglect will be abolished. Freudenheim is facing housing violations for neglecting the building. Though residents are fighting, Tielman states that “an injunction is unlikely.”

“We had a letter of violation against him. He was supposed to have started work to stabilize the brick this Monday. We all hope this building could be saved. But we’ve got five houses evacuated and we cannot tolerate any further delay. We’ve got to get people back into their homes in a safe condition,” said Richard Tobe, Commissioner of the city’s Permit and Inspection Services.

Demolition is set to resume at 8:00 a.m.in the morning of Saturday June 14.

Mike Lombardo, the Commissioner for the Buffalo Fire Department, believes that the building was built in 1812 or 1814, making it nearly 200 years old. It is one of only three stables still standing in the city.

Retrieved from “https://en.wikinews.org/w/index.php?title=Surprise_demolition_of_partially_collapsed_building_in_Buffalo,_New_York_met_with_opposition&oldid=771930”

5-year old American girl dies after visiting the dentist

Friday, September 29, 2006

Diamond Brownridge, a 5-year old girl from Chicago, Illinois, has died after a visit to the dentist. Children’s Memorial Hospital officials say that the girl was rushed to the hospital when she never woke up after being sedated for a dental procedure. She had been in a coma, on life support, since being admitted to the hospital early in the weekend.

“She passed very peacefully and beautifully,” said the hospital in a statement that the family issued.

Ommettress Travis, the mother of the girl, was asked not to remain inside the room while dentists were operating on the girl to repair two cavities and to have at least two caps replaced. Travis says after thirty minutes she was asked to come back in and found Brownridge not breathing, in the dentist chair.

Hicham Riba, a specialist and professional in anesthesia, who was also licensed, was the dentist in charge of the procedure.

“My family and I are so sad. May God bless Diamond and her family. Every time you have a tragedy like this, you pray more. I don’t think I will ever go back to a normal life after an experience like this,” Riba said in a statement on Wednesday, September 28.

According to the family, the girl had been given at least a triple dose of medicine that sedated her. Those drugs include: nitrous oxide gas, a single dose of an “oral agent” and an IV.

A judge has ordered that all equipment and materials used during the operation be protected and examined. The girl’s medical records have also been ordered to be examined.

There is no word on whether or not any charges will be filed against Riba or any of the dentist’s staff.

Retrieved from “https://en.wikinews.org/w/index.php?title=5-year_old_American_girl_dies_after_visiting_the_dentist&oldid=434213”

Clinical Toenail Removal

Clinical Toenail Removal

by

Elizabeth Durham

The main objective of having clinical toenail removal done is to have a sterilized environment, and the peace of mind knowing that the offending nail is being removed professionally. There are a number of different conditions that can cause problems with the toenail, the most common being ingrown toenail. Another is black toenail. To determine exactly what disease is affecting the toenail, the doctor will normally perform a biopsy. This article will give you the information on the procedures currently being used to remove an ingrown toenail.

[youtube]http://www.youtube.com/watch?v=nfRsBijqS4E[/youtube]

An ingrown toenail is a very painful condition and it is not always possible to treat it without having surgery performed. The surgery is not such a difficult procedure and the simplest form requires removing the nail matrix with the use of phenol. To be certain of the surgery being successful, a sufficient amount of anesthetic must be used and the bleeding needs to be controlled. This procedure requires removing a longitudinal portion of the nail plate. Using a sterile cotton swab, phenol is applied several times to the nail matrix area and then cleaned with a saline solution or alcohol. Using the phenol prevents the nail plate from re-growing in that area. As the nail grows, it will fold and protect the nail bed from the phenol. For a number of weeks after the surgery there is likely to be drainage from the toenail, but it should heal to leave the nail plate looking good. Toenail surgery is a safe procedure, but as with other types of surgery there is always a chance of unseen complications. Having the toenail removed by a competent surgeon will minimize the risk of complications arising. The biggest problems after having a toenail removed are scarring and infection. Patients need to be properly prepared for the surgery, and anyone suffering from prosthetic (artificial) heart valves should be given a treatment of antibiotics if there is any chance of infection occurring. Scarring of the toe after surgery can be a problem, and this can be seen on the nail matrix. This is the part of the toe that is responsible for the formation of the nail plate. When the doctor is performing the biopsy, he will normally take it from the distal part to prevent the nail splitting. Another complication of the surgery, but less common, is dystrophy of the nail. The decision to have the toenail surgically removed should not be taken lightly. Although a simple procedure, the recovery time is longer than most people realize. Toenail removal should only be performed when all other treatments have been tried.

Elizabeth deals with a whole range of medical issues including

yellow toenails

and

black toenail

. Treatments are usually designed to speed up the healing process, so that normality can be resumed as quickly as possible.

Article Source:

Clinical Toenail Removal